Engineering Story · Structural failure

One Rod Became Two: The Hyatt Regency Walkway Collapse

A small change to a hanger-rod detail doubled the load on one connection. Nobody checked it, and 114 people died.

Watch the 47-second version with narration, or read the full story below.

On the evening of 17 July 1981, about 1,600 people were at a dance in the lobby of the Hyatt Regency hotel in Kansas City. Two suspended walkways fell onto the crowd. 114 people died and more than 200 were injured. The cause was one connection detail that was changed during construction and never checked.

How the walkways were hung

The lobby was a tall atrium crossed by walkways at the second, third and fourth floors. The second-floor walkway hung directly below the fourth-floor one. In the original design, both were carried by the same set of long steel rods from the roof. Each rod passed through the fourth-floor beam and continued down to the second floor. A nut under each beam held up that walkway only.

One rod became two

That design needed rods threaded along most of their length, which was awkward to make and easy to damage on site. The steel fabricator proposed a change: use two shorter rods instead of one. The upper rod would run from the roof to the fourth-floor beam. A second rod, offset a few centimetres, would hang from that same beam down to the second floor.

It looked like a small change. In fact it altered the load path. The fourth-floor beam now carried its own walkway and the walkway below. The load on the nut under that beam doubled.

A weak detail made worse

The beams were two steel channels welded together to form a box, and the rod passed through the weld line, the weakest place. Investigators found that even the original detail met only about 60 percent of the load the building code required. After the change it had roughly 30 percent. With people on the walkways, the nuts pulled through the beams.

Who checked it?

The fabricator believed the engineer had reviewed the change. The engineer's stamp was on the shop drawings, but no one had run the calculation. The engineers lost their licences. The case is still taught in engineering schools around the world.

The engineering lesson

Every change to a connection needs a full structural check. Ask where the load goes, and never stamp a shop drawing you have not actually reviewed.

Photos via Wikimedia Commons. Hyatt Regency investigation, figure 5.30a: U.S. National Archives (NBS report), Public domain, via Wikimedia Commons; Hyatt Regency investigation, figure 5.4: U.S. National Archives (NBS report), Public domain, via Wikimedia Commons; Hyatt Regency investigation, figure 5.7: U.S. National Archives (NBS report), Public domain, via Wikimedia Commons; Hyatt Regency investigation, figure 5.6: U.S. National Archives (NBS report), Public domain, via Wikimedia Commons.